summaryrefslogtreecommitdiffstats
path: root/source/text/scalc
diff options
context:
space:
mode:
authorAndreas Heinisch <andreas.heinisch@yahoo.de>2021-04-19 07:54:12 +0200
committerOlivier Hallot <olivier.hallot@libreoffice.org>2021-04-20 11:11:01 +0200
commit1cb52499d411fbef66b0b0fa50096f9896938acc (patch)
tree84296247a4474c7289ef80c0522e3a192bb44b67 /source/text/scalc
parentFix typos (diff)
downloadhelp-1cb52499d411fbef66b0b0fa50096f9896938acc.tar.gz
help-1cb52499d411fbef66b0b0fa50096f9896938acc.zip
tdf#100070 - Corrected example for WEEKNUM using System 1
Change-Id: Ie659fa5dbc9dcd4cb5c3b4d6b15a6b045a3cf36e Reviewed-on: https://gerrit.libreoffice.org/c/help/+/114187 Tested-by: Jenkins Reviewed-by: Olivier Hallot <olivier.hallot@libreoffice.org>
Diffstat (limited to 'source/text/scalc')
-rw-r--r--source/text/scalc/01/func_weeknum.xhp2
1 files changed, 1 insertions, 1 deletions
diff --git a/source/text/scalc/01/func_weeknum.xhp b/source/text/scalc/01/func_weeknum.xhp
index a23d5cdf50..99a089af3d 100644
--- a/source/text/scalc/01/func_weeknum.xhp
+++ b/source/text/scalc/01/func_weeknum.xhp
@@ -174,7 +174,7 @@
<embed href="text/scalc/01/04060102.xhp#datenumberwarn"/>
<embed href="text/scalc/01/common_func.xhp#sectionexample"/>
<paragraph role="paragraph" id="par_id3150704" xml-lang="en-US"><item type="input">=WEEKNUM(DATE(1995;1;1);1)</item> returns 1</paragraph>
-<paragraph role="paragraph" id="par_id3149792" xml-lang="en-US"><item type="input">=WEEKNUM(DATE(1995;1;1);2)</item> returns 52. If the week starts on Monday, Sunday belongs to the last week of the previous year.</paragraph>
+<paragraph role="paragraph" id="par_id3149792" xml-lang="en-US"><item type="input">=WEEKNUM(DATE(1995;1;1);2)</item> returns 1. Using System 1, the week containing January 1 is the first week of the year.</paragraph>
<paragraph role="paragraph" id="par_id3149793" xml-lang="en-US"><item type="input">=WEEKNUM(DATE(1995;1;1);21)</item> returns 52. Week 1 starts on Monday, 1995-01-02.</paragraph>
<paragraph role="paragraph" id="par_id3149794" xml-lang="en-US"><item type="input">=WEEKNUM(DATE(1999;1;1);21)</item> returns 53. Week 1 starts on Monday, 1999-01-04.</paragraph>
<section id="relatedtopics">